[rt-devel] Linking actions (for 2.0)
Brandon S. Allbery KF8NH
allbery at ece.cmu.edu
Mon Apr 24 11:18:06 EDT 2000
On Monday, April 24, 2000 11:16 AM -0400, "Rouillard, John"
<RouillardJ at brevard.cc.fl.us> wrote:
+-----
| > > <BASE> DependsOn <TARGET>
| > >
| > > ...meaning that TARGET has to be resolved before BASE (really) is
| > > resolved. A stalled BASE should be reopened when TARGET is resolved.
| > > When "spawning" a new TARGET i.e. through the web interface, the BASE
| > > should be stalled (if it's open).
| > >
| > I'd sort of rather that we not use "Stalled" for that, but that we
| > actually figure out what tickets are dependent on a given
| > ticket at runtime.
|
| I used to be in your camp Jesse, but I think Tobias's scheme of stalling
| the BASE has some merit. Stalling means: "don't work on this ticket until
| something changes". So it implies that new transactions shouldn't be added
+--->8
The problem with this is, how do you determine when to un-stall the ticket?
Currently, any non-comment communication unstalls it (and this is quite
useful); either this would need to change or a hierarchy of rules for
un-stalling tickets would need to be developed.
--
brandon s. allbery [os/2][linux][solaris][japh] allbery at kf8nh.apk.net
system administrator [WAY too many hats] allbery at ece.cmu.edu
electrical and computer engineering KF8NH
carnegie mellon university ["better check the oblivious first" -ke6sls]
More information about the Rt-devel
mailing list